A warehouse rarely closes for a move. Orders still ship, trucks still arrive, and the racking has to come down in an order that keeps the picking faces you still need standing. That is a sequencing problem before it is a lifting one.









We walk the site with your operations lead and build the sequence around what still has to ship. Usually that means moving slow-moving stock and empty racking first, keeping the fast picking faces live until the last possible day, then swinging the whole operation across a weekend.Racking is photographed and measured before it comes down, because beam levels and configurations rarely match anybody’s drawings after a few years of adjustments.

Fully licensed moving company with full replacement coverage.

The crew is covered, so you carry no liability on moving day.

Certified International Association of Movers network partner.
2024
February 2026
Machinery skates, pallet jacks, panel carts, ratchet straps, shrink wrap, corner boards, dock plates and the tools to strip and rebuild teardrop and structural racking.Forklifts, scissor lifts and riggers are arranged where the site needs them. That decision is made at the site walk so the kit arrives with the crew rather than a day later.
Most industrial parks restrict dock hours and some restrict truck movements at night. We schedule loads inside your permitted windows and coordinate with the neighbouring tenants where a shared yard is involved. Six to ten weeks of lead time is realistic for anything over ten thousand square feet. Racking permits and fire-system sign-off at the new building are usually the long poles, not the move.